Saturday, July 30, 2011

More Progress....7/30/11


Well today we went to see the inside of the house again. The house is now locked unless someone is working on it, so we had to grab the key from the sales office. the kids had a good time running around, although they have to be very careful as there are nails, etc all over the place on the floors. We have our pre settlement walk through on Aug 24th and then we close on Aug 31st. I am getting very excited!

Big things left are flooring needs to be finished, counters in the kitchen, backsplash, appliances, and sod outside. And all the other little things I don't know about!

Front of the house..siding is done and they finished the front porch this morning! Just need the front door painted (black). But I believe they do that as one of the last things before we move in. I am very happy with how the outside colors came out. We only got to choose the color of the siding, as the outside elevation of the home was predetermined since the foundation was already poured before we signed the contract.
Trying out colors in the mater bath. This one was a 'no' :)
Lindsay standing in her new room :)
Tyler in his new room!
Foyer
This area is a loft on the 2nd floor. It will be the kids 'hang out' area. Plan is to put some of their toys in here, bean bag chairs, a tv and eventually computers and desks. This is nice since we can keep an eye on them :)
Posing in front of the fireplace:
Dining room.
Trev measuring where furniture will go in the office:

No comments: